The District
Structural Steel
Project numbers
38 tonnes
Total steel.
900
Total hours.
Explorer Holdings
Client.
A tricky proposition
Overview.
The seismic upgrade of the building at 30 Waring Taylor Street was always going to be a challenging project.
Our involvement.
As a historic building it has a façade that can’t be altered, and being on a smaller street between Lambton and Customhouse Quays makes the logistics for truck deliveries and cranes difficult. A third factor is the neighbouring buildings hard against it on two sides, which makes access difficult and adds to the complexity of the work.
The outcome.
Our work was lauded by SCNZ as we won the inaugural SCNZ Awards 2022 under Seismic Strengthening category
The Petone Engineering difference
-
Description text goes here
-
Description text goes here
-
Description text goes here
-
Item description
-
Item description
Brian McGuinness
Director
LT McGuinness
“Working with Petone Engineering was amazing. Their dedication to accuracy, and running a professional project on 30 Waring Taylor was outstanding. I can’t recommend Chris and his team highly enough”