Sacred Heart Cathedral

Project Facts

  • Steel weight: 23 tonnes

  • Man hours: 2,700 hours

  • Client: L T McGuiness

  • Location: 41 Hill Street, Thorndon, Wellington

  • Consultant: Dunning Thorndon Consultants

  • Investigations showed that the Sacred Heart Cathedral only met 15% of NBS for Earthquake strength.

  • Petone Engineering is fabricating and installing the steel work needed for the seismic strengthening.

Learn more about our other signature projects

Petone Engineering is a leading provider of structural steel and seismic strengthening, having delivered an impressive portfolio of projects across the lower North Island and beyond.